Our Services
About Our Services
At Guide, we offer a vast collection of oilfield chemistry and field services, all designed and fit to meet your specific reservoir needs. Our expertise in last-mile logistics ensures smooth frac operations. This means that you have the right product, at the right location, at the right time to eliminate NPT.
Oil & Gas Testing
Frac Fluid Design
- Flow Loop – Friction Reducer
- Viscometer - Viscosity Building Friction Reducer (HVFR)
- Capillary Suction Timer (CST) – Clay Control (Swelling Clays)
- Roller Oven - Clay Control (Migrating Clays)
- Bug Bottle and ATP – Biocide
- Scaling Indices and Dynamic Scale Loop – Scale Inhibitor
- Chelation and Reduction Testing – Iron Control
- Overall Compatibility Testing with the Full Fluid System
Surfactant and Microemulsion Testing
- Interfacial Tension
- Surface Tension
- Contact Angle
- Imbibition
- Column Testing
- Demulsification
Analytics
- Water Analysis
- Oil Analysis
- Formation Analysis
Technical Field Support
Guide provides technical field support to ensure smooth frac chemical operations. Operations specialists are available to be onsite 24/7 to monitor chemical accuracy, support planning and logistics, and maintain efficient operations.
Toll Manufacturing
Our team is committed to the success of our customers and consistently seeks opportunities to collaborate on the development of new products or providing outsourced manufacturing for their proprietary formulations. Our EPA registered facility enables us to provide services to support the Oil & Gas, Industrial, and Agricultural industries.
Safety Standards
We are proud to have achieved a TRIR, LTIR, and LTA of zero since our inception in April of 2019 and continue to work towards maintaining this standard. It is our focus to not only meet expectations but to exceed them. We strive to keep you running efficiently, never waiting on us to keep operations moving. Our history of zero NPT reflects our dedication to ESG, on-time delivery, and proficient on-site inventory management.
2,043
DAYS SINCE INCEPTION WITH A ZERO TRIR, LTIR, LTA, AND NPT